Got a good bit done over my three day weekend:
I actually got my 94 subframe in today, but didn't snap any pictures. I'm pretty confident that my car will be running in a month (2022 edit = LOL!). I have made a few changes to my plan electrically and I'm modifying my front harness so that I have 1 fuse / relay box in the engine bay instead of 3. I'm about half way done, but I'll probably spend the rest of the week wrapping it up. Next thing on the list to do is to install the cobra diff, take drive shaft measurements, and make the order. Likewise, I need to design, order, and install my fuel system. That should all happen in the next 2 weeks.